automation system and electronic sensor of intelligent power transformer substation |
|
|
|
Project Introduction |
Project summary: at present there are around
25,000 power transformer substations in China. According to industrial
criteria, the designed use of secondary equipment of power system is usually
10 years. Plus the market demand on the construction of new power transformer
substations, the market capacity of the whole automation system of power
transformer substations are very considerable. Therefore, the development of automation system and
electronic sensor of intelligent power transformer substation will be important part for
building intelligent power transformation substations and then build smart
grid. The market perspective is broad. |
Main Content and Scale |
Main content and scale: ① To build simulative
testing platform for
intelligent power transformer substation, develop new generation intelligent
assembly platform and network and intellectualized protection testing control
device and develop the software of system level of intelligent power
transformer substation and the configuration software for the whole
substation, etc.
②To research and develop electronic sensor based on
optical fiber gyroscope principle, the electronic sensor and DC sensor used
for GIS and PASS; to build production and office site, high voltage lab and
relevant supporting facilities.
Once the project is launched for production, it can reach
the annual production output of 400 sets of automation systems and 3,000
electronic sensors for intelligent power transformation substations. |
Estimated Total Investment |
Total investment of the project: the total investment is CNY150
million, and investment in fixed assets CNY120 million. |
Economic Benefits |
Economic profit: after the project is
launched for production, the estimated increase of annual sale will be CNY200
million, and net profit CNY52 million. The construction period of the project
is 2 years, and it is estimated that investment cost will be returned in 3
years. |
Investment Mode |
Ways of investment: ① solely foreign investment. The place for construction is the Power
Transmission and Transformation Equipment (Smart Grid) Industrial Park or the
Italy Industrial Park.
②Joint venture cooperation. The partner will be
Baosheng Group, which is a large-scale state-owned enterprise specialized in
the manufacture of electric products including wires and cables of 500Kv and
below, cable materials and transformers, and switch cabinets, etc. The enterprise
has been elected as one of the top 500 Chinese enterprises, top 500
manufacturers of China and top 100 mechanical industry of China successively. |
Contact |
Organization: Key Industrial Project Advancement
Headquarters of Baoying County
Contact: Mr. Ge
Tel: 0514-88290216
Fax: 0514-88290216
Add: (Administrative Center) No.88, Baoying Avenue , Baoying County, Jiangsu Province
E--mail:bygyzhb@126.com |
|
![](images/zw_xl_top.gif) |
|
![]() |
![](images/zw_xl_03.gif) |
|
![](images/zw_xl_05.gif) |
|