简体中文 ENGLISH 繁体中文
Home  ●   About Baoying  ●  Government  ●  Investment  ●  Business News Investment projects
automation system and electronic sensor of intelligent power transformer substation
2010-5-18     〖Print〗〖Close〗

 

Project Introduction

Project summary: at present there are around 25,000 power transformer substations in China. According to industrial criteria, the designed use of secondary equipment of power system is usually 10 years. Plus the market demand on the construction of new power transformer substations, the market capacity of the whole automation system of power transformer substations are very considerable. Therefore, the development of automation system and electronic sensor of intelligent power transformer substation will be important part for building intelligent power transformation substations and then build smart grid. The market perspective is broad.

Main Content and Scale

Main content and scale: ① To build simulative testing platform for intelligent power transformer substation, develop new generation intelligent assembly platform and network and intellectualized protection testing control device and develop the software of system level of intelligent power transformer substation and the configuration software for the whole substation, etc.

②To research and develop electronic sensor based on optical fiber gyroscope principle, the electronic sensor and DC sensor used for GIS and PASS; to build production and office site, high voltage lab and relevant supporting facilities.

Once the project is launched for production, it can reach the annual production output of 400 sets of automation systems and 3,000 electronic sensors for intelligent power transformation substations.

Estimated Total Investment

Total investment of the project: the total investment is CNY150 million, and investment in fixed assets CNY120 million.

Economic Benefits

Economic profit: after the project is launched for production, the estimated increase of annual sale will be CNY200 million, and net profit CNY52 million. The construction period of the project is 2 years, and it is estimated that investment cost will be returned in 3 years.

Investment Mode

Ways of investment: solely foreign investment. The place for construction is the Power Transmission and Transformation Equipment (Smart Grid) Industrial Park or the Italy Industrial Park.

②Joint venture cooperation. The partner will be Baosheng Group, which is a large-scale state-owned enterprise specialized in the manufacture of electric products including wires and cables of 500Kv and below, cable materials and transformers, and switch cabinets, etc. The enterprise has been elected as one of the top 500 Chinese enterprises, top 500 manufacturers of China and top 100 mechanical industry of China successively.

Contact

Organization: Key Industrial Project Advancement Headquarters of Baoying County

Contact: Mr. Ge

Tel: 0514-88290216        Fax: 0514-88290216

Add: (Administrative Center) No.88, Baoying Avenue , Baoying County, Jiangsu Province

E--mailbygyzhb@126.com


 
 
Copyright © 2010. The People’s Government of Baoying City All rights reserved.Tel: +860514-88290216 88282415
Constructed and Managed by Information Management Center for Baoying Party and Government Bodies | Jiangsu ICP record No.05029266